In the previous article I talked about how to create free account in GPSWOX now we will use it to add tracking devices first login by the link which sent to you in email as shown in the previous articles Above picture show you the admin panel from this page units, users, logo, geofence, and POI are managed in this article I will talk about add devices with all details only and in another article may be I show you other things to add new user press on add new device as shown below Main tab Active: is shown weather device is active or not User: is represent to which user create device name: is the name of the device which shown in monitor menu Device IMEI / Tracker ID : is the unique number of device which write on the device Expiration date: in this date the device will be inactive
The largest power station in the world These are the top 10 electric power plants in the world Whoever has knowledge of more details or has found errors in the article, please write his opinion in the comments 1. Three Gorges Dam: Capacity: 22,500 Type: Hydro Annual Generation: 101.6 (2018) Location: China 2. Itaipu Dam: Capacity: 14,000 Type: Hydro Annual Generation: 103.09 (2016) Location: Brazil, Paraguay 3. Xiluodu: Capacity: 13,860 Type: Hydro Annual Generation: 55.2 (2015) Location: China 4. Belo Monte : Capacity: 11,233 Type: Hydro Annual Generation: 39.5 (expected) Location: Brazil 5. Guri: Capacity: 10,235 Type: Hydro Annual Generation: 47 (avera
Comments
Post a Comment